Oprava náterov nosných oceľových konštrukcií mosta R1 PR1bina

Filter reference

Type of construction

Required guaranteed lifetime period

Used technology

Applied coating system

Cancel filters

Oprava náterov nosných oceľových konštrukcií mosta R1 PR1bina

pre-surface treatment by blasting with an ultra-high-pressure water jet Falch 2500 bar, repair of coatings of steel structures of the R1 bridge

Realized for From To
ViA PRiBiNA, a.s. 04/10/2022 28/04/2023
Investor Used technology Required guaranteed life-time period
Via PRiBiNA, a.s. GRACO Airless, manually 5 years
Applied coating system